The last of the GI.4 Heat Exchangers were installed last week. Work will begin soon on the horizontal connections between the bores and will eventually be connected to the buildings in the geo-district. While the bore headers currently appear above grade, the entire field will eventually be  beneath the frost line in order to prevent  freezing.

  • Facebook
  • Twitter
  • LinkedIn
  • Facebook
  • Twitter
  • LinkedIn

Share This

Share this post with your friends!